Torque is the twisting force applied during tightening, while preload is the clamping force created in the joint.

The relationship between torque and preload changes with friction, coating, lubrication, hardened washer use and thread condition.

For critical joints using structural bolts or tension-control bolts, buyers should ask engineers for installation torque and inspection requirements instead of relying only on catalog dimensions.