Operating dutyNuclear auxiliary and balance-of-plant systems often prioritize traceability, cleanliness, corrosion resistance and controlled substitution more than extreme temperature.
Recommended assemblyDocument-controlled stainless hex bolts, socket screws, anchor rods, washers and lock nuts supplied by drawing, plant standard or qualified equipment package.
Material routeA2 / A4 stainless, B8 / B8M and selected nickel alloy fasteners are used according to water chemistry, ventilation, supports and cabinet or skid requirements.
Installation controlThe key control is not only torque. Material substitution, coating change, cleanliness level, marking and item traceability must be confirmed against the project classification.
Outage / QA controlSafety classification, QA level and approval route must be confirmed before supply; balance-of-plant hardware should remain separated from any safety-related package.
Engineering checks- Do not substitute material or coating without project approval
- Keep heat traceability through small fastener lots
- Separate safety-related and non-safety-related documentation paths
- Confirm whether the package is safety-related, quality-related or commercial-grade dedication scope
Required recordsCoC and 3.1 MTC where requiredPMI report for alloy-controlled lotsClean packing and item-level traceability recordApproved supplier / project documentation reference
Common riskThe biggest risk is often an undocumented substitution, not a lack of nominal strength.